Our next regular meeting will be held Thursday, July 6, 2023 at 7:00 PM at the East Union Township Fire Station, 3400 S. Apple Creek Rd. Apple Creek, OH. This will be the Annual Budget Hearing for the 2024 budget. The public is encouraged to attend.
BOARD OF TRUSTEES
Valorie Lewis
4337 S. Kansas Rd.
Apple Creek, OH 44606
Fiscal Officer
(330) 464-1836
Jim Miller
442 Spring Run Drive
Apple Creek, OH 44606
Trustee
(330) 464-9994
Joseph Rabatin
579 West Main Street
Apple Creek, OH 44606
Trustee
(330) 465-3539
Dan Hodge
6348 E. Lincoln Way
Wooster , Ohio 44691
Trustee
(330) 263-0517
EASTWOOD ALLOTMENT DECISION REFERRING TO THE MEETING ON AUGUST 4, 2022.
THE EAST UNION TOWNSHIP TRUSTEES HAVE DISCUSSED THE FLOODING ON ROBIN AND GALE STREETS MANY TIMES AND HAVE ACTUALLY REACHED OUT TO ALL OF THE RESIDENTS OF EASTWOOD ALLOTMENT TO DO AN INCOME STUDY TO HELP WAYNE COUNTY SECURE A GRANT TO FIX THE FLOODING ON ROBIN STREET. WE HAVE ALSO ASKED THE WAYNE COUNTY ENGINEER TO GIVE US A QUOTE ON INSTALLING A BIG TILE DOWN THE MIDDLE OF THE ROAD, AND AS IT TURNED OUT, IT WOULD BE OVERLY EXPENSIVE AND MAY NOT EVEN FIX THE PROBLEM IN THE END. THERE WAS A STUDY DONE OVER 10 YEARS AGO ON WHAT IT WOULD TAKE TO DO WHAT THE DEVELOPER SHOULD HAVE DONE BEFORE THEY ADDED ROBIN STREET, AT THAT TIME IT WOULD COST OVER $800,000 DOLLARS. WHEN WE RECEIVED THE ARPA FUNDS WE CHECKED WITH OUR LEGAL COUNSEL TO SEE IF WE COULD SPEND MONEY OFF OF ROAD RIGHT OF WAY, THEY SAID WE COULD AT THAT TIME. THEY SAID WE COULD NOT DO THIS PROJECT DIRECTLY, AND THAT WE HAD TO GET THE RESIDENTS OF THE ALLOTMENT AND THE AREA LANDOWNERS THAT OWN THE LAND WHERE THE WORK NEEDS TO BE DONE TO COME TOGETHER TO GET THIS DONE. SINCE THE MONEY WE COULD SPEND OFF OF THE ROAD RIGHT OF WAY WAS LIMITED, WE CHECKED WITH OUR LEGAL COUNSEL ONCE MORE. WE ASKED IF WE HAD LESS THAN THE AMOUNT NEEDED TO FINISH THE JOB AS IT WAS ENGINEERED THAT WE SHOULD NOT START. THE CONCERN WAS THAT THE PROJECT MIGHT FIX THE FLOODING ON ROBIN AND GALE STREETS DURING VERY HEAVY RAINS, BUT WOULD THEN IN TURN CAUSE FLOODING ON THE OTHER TWO STREETS. AT THAT POINT THE TOWNSHIP WOULD BE LIBEL FOR THE DAMAGES CAUSED.
EAST UNION TOWNSHIP TRUSTEES
2023 VARIOUS ROAD MATERIAL BIDS
MELWAY PAVING CO., INC
Liquid Asphalt furnished and applied to township roads
(50,000 gallons or less)
MC-30, MC-70, MC-800 or MC-3000 $ 3.55 per gallon
CRS-2, RS-2 $ 3.55 per gallon
Asphalt Mixes
404G Hotmix laid $ 110.00 per ton
STONE furnished, hauled, spread and rolled on the township roads as directed by the Trustees
Washed, chert-free aggregate. See separate stone specification sheet
#8 Limestone $ 47.80 per ton
#67 Limestone $ 49.00 per ton
Various Other Work
Load, haul, spread & roll limestone from township
Stockpile $ 17.00 per ton
Grader information year 2014 Cat 12M $ 150.00 per hour
Reclaimer information year 2007
Model Terex 425 $450.00 per hour
Motor Paver Work
Limestone – Load, Haul, Spread & Roll from $ 30.00 per ton
Township Stockpile
CMS-2 applied through motor paver on township $ 3.45 per gallon
roads
HOLMES SUPPLY CORPORATION
Asphalt Mixes
Winter Cold Mix FOB $150.00 per ton
404G Hotmix FOB $ 83.00 per ton
STONE furnished, hauled and dumped at township garage (3,000 tons more or less) Washed, chert-free aggregate. See separate specification sheet
#8 Limestone $ 31.00 per ton
#67 Limestone $ 32.00 per ton
#411 Limestone $ 26.00 per ton
Asphalt Sand & Grits
Asphalt Sand $ 7.00 per ton
Grits $ 5.00 per ton FOB
LIL JOHN TRANSPORT
Stone furnished, hauled and dumped at township garage (3,000 tons, more or less)
#8 Limestone $ 31.55 per ton
#67 Limestone $ 25.50 per ton
#411 Limestone $ 23.45 per ton
ORRVILLE TRUCKING & GRADING
STONE furnished, hauled and dumped at township garage (3,000 tons, more or less)
#8 Limestone $ 27.75 per ton
#411 Limestone $ 22.85 per ton